Projects
All Projects
SEMPRA Energy Headquarters
NOVA provided special inspection and materials testing for the new Sempra Energy Headquarters
Westfield UTC
In expanding 389,150 sq. ft, UTC utilized NOVA Services for special inspection and materials testing
Earl Warren Middle School
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur. Excepteur sint occaecat cupidatat non proident, sunt in culpa qui officia deserunt mollit anim id est laborum.
Torrey Point
NOVA Services provided geotechnical observation and testing, materials testing and special inspections
Torrey Point (previously known as Sorrento Pointe), will include 2 office buildings, 3-story and 2-story, measuring approximately 59,000 SF and 33,000 SF, respectively. These prime located buildings will have panoramic unobstructed views of the Torrey Pine State Park Beach and Reserve and the Pacific Ocean.
Richman Group’s K1
Nova Services provided geotechnical engineering observation and testing, and materials testing and special inspections.
Bosa Tower “Savina” High Rise
Nova performed construction materials testing and special inspections.
Kettner & Ash Condos Info
Building Name: SAVINA
Location:1372 Kettner Blvd San Diego, CA 92101
Floors: 36 (415 feet)
Parking Spaces: 533 (3 Sub Levels)
Retail:11,550 Sq Ft
University of California, San Diego Structural Materials & Engineering Building
NOVA provided special inspection and materials testing services on the UCSD Structural and Materials engineering building. A $70 million, 169,000 SF stand-alone building for the School of Engineering. The facility is intended to merge the areas of advanced materials testing with scientific visualization. The new building is five stories including a basement and includes 73 individual engineering labs, offices, conference center, visual arts studios and a high bay fabrication suite. Building structure is reinforced concrete and the exterior skin consists of exposed architectural concrete, glass curtain wall, plaster and ornamental sunshades.